Village of Harveysburg

The Village of Harveysburg project was completed in June of 2014. We removed 18 existing single-pane steel casement windows in 6 masonry openings and installed new glass block. We used the same aluminum channel and mull system with pre-assembled silicone glazed windows. The job was completed in 3 days.

Before
Before
After
After
After